You have become the owner of your land plot – Congratulations! But soon after the acquisition of land, the question arises, what next? Let’s see what needs to be done before building a house.

Why preparing the site for construction is so important

Where does construction begin? That’s right, from the foundation. But not really. It all starts with well-prepared soil, and without proper preparation, even the strongest foundation can be spoiled.

What you may encounter when starting construction without a prepared site according to the expert residential contractors in Edmonton:

  • Increasing the complexity and cost of work;
  • Violation of construction technology;
  • Flooding of the construction site or the future house;
  • Selection of the wrong foundation;
  • Premature shrinkage or destruction of the foundation;
  • Penalties for violation of laws, regulations, and rules on the location of objects on the site;
  • Increase in the term of work;
  • Damage to communications hidden on the site.

Step 1: Planning and documentation

Where to start preparing the site for the construction of a house? To begin with, consider the preliminary works:

Topographic survey of the area

A topographic survey (or engineering and geodetic surveys) is needed to determine the clear boundaries of your land plot. This will protect you from possible conflicts with neighbours and fines for violating regulations. 

Geological surveys

Geological surveys are necessary in order to:

  • Find out the composition of the soil;
  • Determine the density and bearing capacity of the soil;
  • Determine the depth of groundwater.

This information will be needed in the future to choose the type of foundation, as well as for the construction of a sewer, well or well. 

Plot planning and house project

What else you need to know before building a house is its location on the site, as well as other buildings. Be sure to think over the layout of the site in advance.

Building permit

Before starting construction, it is necessary to obtain a permit. If you do not do this, in the future you may be overtaken by such problems as the recognition of the building as illegal and even its demolition.

Specifications (TU)

Obtaining technical specifications (TU) is the next step in preparing a land plot for construction after obtaining a permit. TU is necessary to connect the house to engineering networks – light, gas, water supply, and sewerage. You can get it by contacting the nearest energy supply organization (utilities).

Step 2: Organization of conditions for construction

Organization of access to the site

Before starting construction work, it is necessary to ensure the passage of equipment to the site. It can be trucks, dump trucks, excavators, lifting equipment, etc.

Communication (water supply, sewerage)

When preparing land for the construction of a house, it is better to take care of water supply and sewerage before the house is built. 

Electrification

Electricity is also worth sorting out before construction, as it will be needed in the process. To connect to the network, contact your local power company.

Organization of conditions for workers

In addition to communications in the workplace, there should also be:

  • Lighting;
  • Equipped toilet (you can rent a booth or build a cesspool)
  • Cabin for builders (which can then be used for economic purposes). In the summer, you can make temporary housing from wood.

Organization of the materials warehouse area

In the process of construction, there will be a need for a warehouse of building materials. It shall be so equipped that the machines can be unloaded unhindered and do not interfere with the workers.

Stage 3: Work on the preparation of the land plot for construction

Consider the work relating directly to the preparation of the land plot itself for the construction of a private house.

Cleaning on the site

Obviously, the site needs to be freed from everything superfluous. It can be:

  • Various garbage 
  • Old buildings. Something can be disassembled manually, something may have to be broken and taken out with the help of special equipment.
  • Vegetation – trees, and shrubs that can interfere with the process or contradict the standards for planning the site. Also, remove the root system.

Fencing of the plot

Next, you need to build a fence, temporarily and from simple materials. 

Soil preparation

  • Working with the soil is very important for the qualitative preparation of the site for the construction of the foundation of the future house. 

Let’s sum up

It is very important to prepare the site for the construction of a private house qualitatively so that there are no inconveniences in the construction process and problems with the foundation in the future. Before you build a house, you need to deal with the documents, take care in advance of the layout of the site and conduct communications, prepare the construction site and soil.